JSC Inter RAO – Electric Power Plants submitted the Business Review for Q1 2018

JSC Inter RAO – Electric Power Plants published the Business Review for Q1 2018.

Indicator*

Q1 2018

Q1 2017

Variation, %

Installed electricity capacity at the end of the period, MW

22,696.2

20,921.7

8.5

Installed heat capacity at the end of the period, Gcal/h

5,812.736

5,812.890

0

Electricity output, million kWh

24,088.840

24,607.936

-2.1

Installed capacity utilization factor, %

49.31

54.45

-

Heat energy delivery via headers, thousand Gcal

1,859.2

1,698.7

9.5

Fuel mix, %

Gas/coal/fuel oil

83.71/16.12/0.17

83.96/15.91/0.13

*Including CJSC Nizhnevartovsk HPP

For Q1 2018, plants of JSC Inter RAO – Electric Power Plants has increased the installed capacity by 1,774.5 MW or 8.5% compared to the same period in 2017 and has amounted to 22,696.2 MW.

In 2017, the installed capacity was increased based on the results of re-qualification from 1,160 MW to 1,190 MW (by 30 MW to make 200 MW at unit No. 1) at Gusinoozerskaya HPP, and from 2,013 MW to 2,031 MW (by 18 MW at unit No. 3) at Nizhnevartovsk HPP. Moreover, in June 2017, a new 447.15 MW power-generating unit No. 12 was put into operation at Verkhnetagilskaya HPP and increased installed capacity of this plant from 615 MW to 1,062.15 MW. In August 2017, a new 861 MW power-generating unit No. 4 was put into operation at Perm HPP and increased the rated power output of the power facility to 3,261 MW. In December, the new power-generating unit of Perm HPP was re-qualified to 903 MW along with units Nos. 1, 2 and 3 each of which added 20 MW, thus the total power output of power plants reached 3,363 MW.

On March 2, 2018, in the Kaliningrad region, the Mayakovskaya TPP with the installed capacity of 157.35 MW and the Talakhovskaya TPP with installed capacity of 159 MW were officially commissioned in Gusev and in Sovetsk respectively. The commissioning of these plants has made it possible to increase the energy security of the westernmost region of Russia, as well as fully compensate for the capacity required to stop the scheduled repair of the first power unit of Kaliningradskaya TPP-2.

For the reported period, the electricity output of JSC Inter RAO – Electric Power Plants facilities has decreased by 2.1 % compared to 2017 and was 24.09 billion kWh. The decrease in the indicator is due to the optimization of the scope of available generating equipment under the conditions of increasing the load of cheap generation by HPP and efficient facilities under the Capacity Supply Agreement. The utilization factor for the installed capacity of the power plants of Inter RAO – Electric Power Plants in Q1 2018 decreased to 49.3%.

We reduced the specific reference fuel consumption (RFC) for electricity generation by 7.97 g of reference fuel per kWh through implementation of measures aimed at energy performance enhancement along with the introduction of energy efficient generating equipment.

As part of the repair campaign, in Q1 2018, 12 repairs of turbine units (a capacity of 2,433 MW) and 9 repairs of boilers (with a total steam capacity of 6,333 t/h) were completed at the power plants of JSC Inter RAO – Electric Power Plants.

Heat energy delivery by the plants of JSC Inter RAO – Electric Power Plants for Q1 2018 increased by 9.5% compared to the same period of 2017 and amounted to 1,859.2 thousand Gcal. Heat energy delivery is increased due to lower average monthly temperature of the outdoor air in winter 2017–2018 in the regions of power plant location.

Data on electric power output and heat energy delivery by JSC Inter RAO – Electric Power Plants*:

Plant

Electric energy,

mln. kWh

Heat energy,

thou. Gcal

Q1 2018

Q1 2017

Q1 2018

Q1 2017

Verkhnetagilskaya HPP

1,433.821

853.306

76.642

84.418

Gusinoozerskaya HPP

1,488.236

1,449.449

99.250

101.986

Dzhubginskaya TPP

55.520

143.409

0

0

Ivanovskiye CPP

14.818

14.495

50.426

46.693

Iriklinskaya HPP

1,330.176

1,369.537

7.652

8.762

Kaliningradskaya TPP-2

1,782.288

1,877.129

139.629

129.416

Mayakovskaya TPP

36.521

0

0

0

Talakhovskaya TPP

44.478

0

0

0

Kashirskaya HPP

202.209

203.686

99.158

93.764

Kostromskaya HPP

2,924.258

4,074.151

77.766

71.341

Nizhnevartovsk HPP

3,628.866

3,565.733

97.983

92.383

Perm HPP

4,264.061

3,799.292

132.998

126.745

Pechyorskaya HPP

928.568

939.085

108.503

102.408

Severo-Zapadnaya TPP

1,486.537

1,800.766

582.032

512.356

Sochinskaya TPP

273.499

299.980

75.530

37.457

Urengoy HPP

963.413

949.938

41.240

36.637

Kharanor HPP

898.916

918.532

49.998

50.382

Cherepets HPP

406.769

465.987

62.121

52.999

Yuzhnouralskaya HPP-1

419.131

502.622

158.247

150.955

Yuzhnouralskaya HPP-2

1,506.753

1,380.839

0

0

TOTAL

24,088.840

24,607.936

1,859.2

1,698.7

*Including CJSC Nizhnevartovsk HPP

The fuel mix at JSC Inter RAO – Electric Power Plants showed no significant changes: the share of natural gas decreased from 83.96% in Q1 2017 to 83.71% in Q1 2018; the share of coal increased from 15.91% to 16.12%; the share of fuel oil decreased from 0.17% to 0.13%.