Pregolskaya TPP

cher_noch.jpg

Location: Kaliningrad, Kaliningrad Region.
Main and backup fuel: natural gas
Emergency fuel: diesel fuel
CTO – Senior Engineer: Kuznetsov Sergey Nikolaevich

Pregolskaya TPP includes four combined cycle power units. All main equipment installed at the plant is made in Russia: four gas turbines PG6111 (FA) manufactured by LLC Russian Gas Turbines; four generators TF-90G-2U3 manufactured by CJSC ELSIB; four steam turbines K-38-8,0 manufactured by JSC Power Machines and four waste-heat recovery units manufactured by JSC Machine-Building Factory of Podolsk.


Kaliningrad Region is the westernmost federal subject of the Russian Federation and a part of Northwestern Federal District. Kaliningrad has a population of 946 thousand people; of those 78% are urban population. The capital of Kaliningrad Region is Kaliningrad. Kaliningrad Region has extensive transportation infrastructure with ramified rail, road and waterway networks as well as Russia-Belarus-Poland gas pipeline. Its largest industries are shipbuilding, metallurgy, metalworking, wood production, papermaking, oil, and amber extraction.