JSC Inter RAO — Electric Power Plants announced operating results for 2020.

Indicator* 2020 2019 Change, %

Installed power generation capacity at the end of the reporting period, MW

21,787.7

22,572.2

-3.5

Installed heat generation capacity at the end of the reporting period, Gcal/h

5,625.736

5,677.736

-0.9

Power generation, million kWh

74,211.3

92,068.3

-19.4

Utilization of installed capacity, %

38.98

46.65

-7.67

Heat distribution from collectors, thousand Gcal

4,337.76

4,488.10

-3.3

Fuel mix, %

Gas/ coal/ fuel oil

82.66/17.17/0.17

84.99/14.83/0.19

-

* Including JSC Nizhnevartovskaya TPP, as well as Mayakovskaya TPP, Talakhovskaya TPP and Pregolskaya TPP in the Kaliningrad region

In the reporting period, power generation by enterprises of Inter RAO — Electric Power Plants amounted to 74.2 billion kWh, having decreased by 19% compared to a similar period in 2019. The change in the indicator is due to a decrease in electricity consumption in the UES of Russia associated with the outside air temperature exceeding the long-term averages in the first quarter and a decline in business activity against the background of the unfavorable epidemiological situation, as well as decommissioning inefficient equipment of the Kashirskaya TPP.

The installed power plant capacity utilization factor of Inter RAO – Electric Power Plants comprised 39% (47% in 2019).

In 2020, the installed power plant capacity of Inter RAO – Electric Power Plants decreased by 3.5% year-on-year and amounted to 21.788 GW (22.572 GW in 2019). This indicator was influenced by several factors:

  • decommissioning of inefficient equipment of three power units at Kashirskaya TPP (with the total capacity of 900 MW) on January 1, 2020, and decommissioning of heating power unit 7 with the capacity of 80 MW on May 1, 2020;
  • decommissioning the hydroelectric unit No. 2 of Iriklinskaya HPP with the capacity of 7.5 MW on May 1, 2020;
  • increasing the installed capacity of Pregolskaya TPP (+7.8 MW) and Mayakovskaya TPP (+0.26 MW) due to recertification;
  • commissioning of power units No. 1, 2, 3 of Primorskaya TPP (totalling+195 MW) in the Kaliningrad region.

As part of 2020 repair campaign at power plants of JSC Inter RAO — Electric Power Plants and JSC Nizhnevartovskaya TPP, repairs of 46 power units (with total electricity generating capacity of 16,356 MW), 56 turbine units (with total electricity generating capacity of 5,611 MW) and 33 boiler units (with total steam generating capacity of 7,412 t/h) were completed.

In 2020, heat distribution by power plants of JSC Inter RAO — Electric Power Plants decreased by 3.3% year-on-year and amounted to 4.338 million Gcal. The decrease in heat distribution is due to a decrease in consumption related to an increase in outdoor air temperature, as well as the termination of heat supply to consumers of Kashirskaya TPP starting from the second half of 2020.

Power generation and heat distribution by the individual power plants of
JSC Inter RAO — Electric Power Plants for 2020:

Power Plant Electric power, million kWh Heat, thousand Gcal
2020 2019 2020 2019

Verkhnetagilskaya TPP

5,156.380

5,023.740

184.063

191.329

Gusinoozyorskaya TPP

3,859.151

4,450.028

241.476

242.264

Dzhubginskaya TPP

347.969

236.152

0

0

Ivanovskiye CCGTs

466.631

322.062

78.817

83.875

Iriklinskaya TPP

5,836.851

5,300.218

11.739

12.204

Kaliningradskaya TPP-2

5,033.558

4,909.055

293.049

309.881

Kashirskaya TPP

344.485

2,394.973

132.129

227.703

Kostromskaya TPP

9,635.107

15,282.881

181.004

182.888

Mayakovskaya TPP

20.517

185.169

0.00

0.00

Nizhnevartovskaya TPP

10,050.572

12,522.625

213.554

245.296

Permskaya TPP

9,310.252

12,507.939

263.503

272.651

Pechorskaya TPP

3,154.900

3,491.665

244.444

262.158

Pregolskaya TPP

975.741

1,639.770

0.00

0.00

Primorskaya TPP

21.244

0.00

0

0

Severo-Zapadnaya TPP

4,866.686

5,504.680

1,663.080

1,567.596

Sochinskaya TPP

668.112

942.652

229.794

231.153

Talakhovskaya TPP

247.577

296.907

0

0

Urengoyskaya TPP

3,794.228

4,037.699

74.130

84.512

Kharanorskaya TPP

3,785.786

3,729.327

116.337

119.545

Cherepetskaya TPP

1,485.741

1,632.266

121.755

122.600

Yuzhnouralskaya TPP-1

1,502.852

1,571.916

288.885

332.442

Yuzhnouralskaya TPP-2

3,646.980

6,086.603

0

0

TOTAL

74,211.32

92,068.33

4,337.76

4,488.10

Fuel mix of JSC Inter RAO — Electric Power Plants changed slightly: the share of natural gas decreased from 85% in 2019 to 83% in 2020; the share of coal increased from 14.8% to 17.2%, and the share of fuel oil increased from 0.17% to 0.19%.