Mayakovskaya TPP

Ввод в эксплуатацию:
March 2, 2018
Установленная электрическая
мощность:
мощность:
160,26 MW
Основное топливо:
natural gas
Аварийное топливо:
diesel fuel
Резервное топливо:
natural gas
The power plant was built in record time – in 18 months. It is designed to ensure energy security of the Kaliningrad region and make its power grid more flexible. The main equipment at Mayakovskaya TPP are two gas turbines PG6111 (FA) Russian-built, manufactured by Russian Gas Turbines.